Mike Haikin
Septic System insurance
12 January 2022 | 31 replies
The upper leg of the "T" or outlet baffle is simply to equalize the air level inside the tank.Continuing downstream, the liquid going out of the outlet pipe travels to the leach field.
Rhyna Orillaneda
Accessory dwelling unit in San Jose, CA
19 December 2019 | 11 replies
.• In Planned Development (PD) districts that are subject to R-1 standards and uses OR where ADUs are not expressly prohibited.• In a low-density cluster development if it conforms to development standards of the R-1 zoning district, and the development and use standards of the low-density cluster permit.ADUs are allowed:• In R-1, R-2, and R-M zoning districts on lots that have one single-family residence.â�¢ On lots with a single-family residence In Planned Development (PD) districts that are subject to R-1 standards and uses OR the ADU conforms to the development and use standards of the PD district.• On any lot with an existing single-family dwelling unit, where regardless of zoning, the lot has any of the following General Plan Land Use/Transportation designations:- Residential Neighborhood- Mixed-Use Neighborhood- Urban Village or Urban Residential- Transit Residential or Rural Residential- Downtown- Mixed-Use Commercial• On two-family (duplex) lots and on multifamily properties• In a low-density cluster development if it conforms to development standards of the R-1 zoning district, and the development and use standards of the low-density cluster permit.Minimum Lot Size3,000 square feetNo minimum lot sizeMinimum Setbacks from Rear and Side Property Lines0 feet for 1-story conversions and new construction.5 feet for second-story ADUs constructed above a garage or accessory structure.0 feet for 1-story conversions and new construction.4 feet for second-story ADUs constructed above a garage or accessory structure4 feet minimum rear and side setbacks required for detached ADU in multifamily developments.Maximum HeightFor detached ADUs:Single story – 18 feet maximumSecond story – 24 feet maximumAttached ADUs are subject to the height limits of the main home.Single-family properties - No change in height requirements.Multifamily properties - 16 feet maximum height for detached ADUs.Rear Yard CoverageArea covered by the ADU, accessory buildings, and accessory structures, except pools, shall not exceed forty percent (40%) of the rear yard.Area covered shall not exceed forty percent (40%) of the rear yard or up to 800 square feet, whichever is greater.Detached ADU Allowed LocationsRear yard only, at least 6 feet away from primary dwelling.May be attached to a detached garage or other existing accessory structure.Must meet minimum setbacks for an accessory building in accordance with Section 20.30.500.No changes except that ADUs that exceed forty percent (40%) of the rear yard must maintain minimum 4 foot side and rear setbacks.
Chen Zhou
Building ADU in San Jose, California
18 June 2021 | 17 replies
.• In Planned Development (PD) districts that are subject to R-1 standards and uses OR where ADUs are not expressly prohibited.• In a low-density cluster development if it conforms to development standards of the R-1 zoning district, and the development and use standards of the low-density cluster permit.ADUs are allowed:• In R-1, R-2, and R-M zoning districts on lots that have one single-family residence.â�¢ On lots with a single-family residence In Planned Development (PD) districts that are subject to R-1 standards and uses OR the ADU conforms to the development and use standards of the PD district.• On any lot with an existing single-family dwelling unit, where regardless of zoning, the lot has any of the following General Plan Land Use/Transportation designations:- Residential Neighborhood- Mixed-Use Neighborhood- Urban Village or Urban Residential- Transit Residential or Rural Residential- Downtown- Mixed-Use Commercial• On two-family (duplex) lots and on multifamily properties• In a low-density cluster development if it conforms to development standards of the R-1 zoning district, and the development and use standards of the low-density cluster permit.Minimum Lot Size3,000 square feetNo minimum lot sizeMinimum Setbacks from Rear and Side Property Lines0 feet for 1-story conversions and new construction.5 feet for second-story ADUs constructed above a garage or accessory structure.0 feet for 1-story conversions and new construction.4 feet for second-story ADUs constructed above a garage or accessory structure4 feet minimum rear and side setbacks required for detached ADU in multifamily developments.Maximum HeightFor detached ADUs:Single story – 18 feet maximumSecond story – 24 feet maximumAttached ADUs are subject to the height limits of the main home.Single-family properties - No change in height requirements.Multifamily properties - 16 feet maximum height for detached ADUs.Rear Yard CoverageArea covered by the ADU, accessory buildings, and accessory structures, except pools, shall not exceed forty percent (40%) of the rear yard.Area covered shall not exceed forty percent (40%) of the rear yard or up to 800 square feet, whichever is greater.Detached ADU Allowed LocationsRear yard only, at least 6 feet away from primary dwelling.May be attached to a detached garage or other existing accessory structure.Must meet minimum setbacks for an accessory building in accordance with Section 20.30.500.No changes except that ADUs that exceed forty percent (40%) of the rear yard must maintain minimum 4 foot side and rear setbacks.
Jacopo Iasiello
Data Scraper for Real Estate
21 September 2023 | 21 replies
This file can be downloaded by the interested parties from the County’s site.Official Records extracts are in the form of ASCII text files in which records are delimited by a caret (^) and have a variable length.There are multiple advantages of using the purchased data since the LIS records contain indexing back to the Original Recording Book (field 19) and the Original Recording Page (field 20) which will be the Book/Page of the Deed of Trust (D-T) or Mortgage (MOR type file in this county).
Eric Crump
Smart Move Or Waste Of Time?
30 October 2017 | 5 replies
While out driving for dollars I found a house which appeared to r vacant.
Steve Smith
Steve From Williamsport,PA
2 January 2014 | 4 replies
Working f/t or p/t job many still find success as REIs.
Nick Rubino
where can a get good comps and marketvalue on homes
26 June 2007 | 3 replies
it would be really nice and make deal doing faster and much easier.please help a newbieI am a REALTOR® (real tor no a sound in the middle) I can pull up innformation on properties using a WAP access and text it to my clients
Nicole Thompson
In a bit of a bind.....advice?
10 December 2008 | 11 replies
We only paid $50k (plus the $30k loan) for the house and when we get to the finish line, our area should support a selling price of 189k (conservatively), so there will still be a profit at the end - IF we can successfully get to the finish line.My husband does remodeling for a living, BUT here's the rub - we don't have enough funds left to both carry it and replace his wages for him to work on it f/t, which is what we'd like the additional funds for - to either hire someone else or have him do it and go to p/t or take a leave of absence from work until it's done.
Clint Coneley
No money, but I can make it if i work out of town and miss my family life?
3 December 2014 | 30 replies
It's a big place with lot of nvgs tors willing to or with a partner.
Elliot Grochal
When to Rent vs. Rent-To-Own
16 May 2019 | 14 replies
Side note: Have we created a new BRR-T-OR method;)?