
2 January 2023 | 2 replies
Mods have mod stamps, manufactured homes have data plates.

11 May 2023 | 78 replies
Electric 4500, permits 1200, power wash siding 500, cabinets 8500, appliances 3700, quartz 5800, insulate 450, tile 6k, demo/dumpsters 6k, mold/vapor barrier crawlspace 2k, doors%closets 3k, subfloor repair 1800, plumbing/fixtures 14k, exterior window/door/fascia replacement 2k, knobs/shelves 3k, replace 1 car garage door and motor 2k, staging/marketing/stamps 500, framing/remove wall/LVL beam/architect 6300, trim/crown/casing 2k, reseal driveway 600, mudjack 1500, paint interior/exterior 7k, maid, etc 1k, demo concrete side patio and seed with dumpster 1700, landscape 1k, replace 8 windows and sliding patio, shower glass door 5500total rehab 107k

12 December 2018 | 11 replies
If it doesn't have the FNMA/FHLMC stamp of approval, Wall Street wants their loan files to be absolutely pristine.

24 October 2017 | 21 replies
You may just need to invest in a pre-inked stamp with your contact info on it, and postage if mailing.

10 March 2020 | 7 replies
@Tom MakinenToo expensive in Sydney and some more complicarioms like the FIRB and 8% extra you pay for stamp duty, something we dont have in the US.

22 June 2022 | 9 replies
Phase 1:· contract signed· deposit sent in (no work begins until a deposit is received)· survey ordered· power location orderedPhase 2 (once survey completed and power location determined):· Plans and Site Plan ordered· Truss Layout OrderedPhase 3 (once plans completed):· order septic design· order energy calcsPhase 4 (after septic design completed)· septic and drainage sent to update plans set· septic sent to DOH for review· septic design approved by DOH· approved septic design transposed into plan setPhase 5 (after updates completed to plan set):· Completed updated plan set sent back to DOH for final permit approval and permit issue· Completed updated plans set sent to engineer for final sign and stampPhase 6· Plan set signed and stamped submitted to City of Cape Coral Permitting along with permit application· Septic Permit IssuedPhase 7:· Initiate loan closing process· review in City of Cape Coral· Permit Approved/Fees paid· Permit Issued/Picked up· Loan closed (either just before or after permit pick up)· Site Prep beginsConstruction Begins!

20 December 2019 | 12 replies
Because I am not always there for walk throughs when the tenant moves in, I always take time stamped photos before handing over the keys.

20 March 2022 | 13 replies
People don’t sue people that qualify for food stamps.

2 November 2019 | 17 replies
Day 1 - Intro to the concept and he also breaks down foreclosure and the power of time stamp and lien order.

16 August 2021 | 6 replies
Palm beach county has a doc stamp fee to record the mortgage at a rate of .70 per $100 or .7%.