Thomas Smith
Dearborn MI Wood Floor Refinishing needed
12 June 2018 | 1 reply
As soon as I get the paint taken care of, the wood floors are going to need refinishing.
Nick Quintin
My Landlord is selling duplex, potential 1st deal
2 July 2018 | 3 replies
The bad: Needs updated baths, kitchens, refinished floors, paint, deck and landscaping at a minimum, basement is gross.
Chris Gilliland
New Landlord looking for tips and advice.
3 November 2017 | 11 replies
Everything is in good shape so my current plan is interior paint, refinish hardwood floors and clean up the yard.
Attila Bertalan
Property built before 1978!
5 November 2017 | 7 replies
Basic inside outside paint and remodel bathroom and kitchen, some minor electrical and refinish hardwood flooring (hidden under carpet :) ).
Jerryll Noorden
YAY, I bought my first "buy and hold"!
14 November 2017 | 40 replies
I had the same thing happen to me and the first thing I wanted to do was have them refinished and show them off; Until I heard a brilliant tip from @Brandon Turner in his book on Rental Property Investing...
Clay W.
Contractor for Refinishing Attic in Buffalo, NY
8 November 2017 | 1 reply
Hi I am looking for recommendations for a contractor to refinish an attic (for a master bedroom and bath).
Edward Howell, V
NOVA Newbie investing in Baltimore Union Square 90 day challenge
14 November 2017 | 5 replies
The stairs need to be sanded and refinished.
Angela Vestal
Allure vs hardwood flooring
3 February 2018 | 12 replies
Beware if you do go with engineered floors especially a rustic engineered you most likely won’t be able to refinish it.
Jim S.
Tax strategy for house hacking SFR
26 November 2017 | 4 replies
Plan is to rent 2 unfurnished/6 mo leases + 2 furnished short term/AirBNB.My house just closed last week and now I'm in the process of fixing it up cosmetically (drywalling over old 50's ceiling tile, ripping up old carpet + refinishing the hardwood underneath, painting, new floors everywhere that doesn't have hardwood).
Eric Dedovesh
House Flip Timeframe
26 November 2017 | 14 replies
My quickest was within 2 months, kitchen, bath, interior and exterior paint, windows, floor refinish and some landscaping.