Skip to content
×
Try PRO Free Today!
BiggerPockets Pro offers you a comprehensive suite of tools and resources
Market and Deal Finder Tools
Deal Analysis Calculators
Property Management Software
Exclusive discounts to Home Depot, RentRedi, and more
$0
7 days free
$828/yr or $69/mo when billed monthly.
$390/yr or $32.5/mo when billed annually.
7 days free. Cancel anytime.
Already a Pro Member? Sign in here
Pick markets, find deals, analyze and manage properties. Try BiggerPockets PRO.
x
Results (10,000+)
Srini Malempati Crime in North Linden and Multi Unit Building
2 August 2024 | 5 replies
I like to look at the inside of their car and see if it is clean or not.
Daniel Church Foreclosure live and flip
1 August 2024 | 2 replies
New windows, doors, Lp siding, fixtures, flooring, Sheetrock, kitchen, bathroom, trim and stairs.
Jenny Ou REHAB COST for different types of work:
29 July 2024 | 5 replies
Please feel free to give feedback on my cost-per-square-foot range:Cosmetic fix: basic carpet, paint, flooring, new hardware, clean up, repair a few things project.
Amber Revels Make ready cost?? Feedback plz
31 July 2024 | 2 replies
I spend close to that amount on cleaning fee's for my rental.
Robert Lopez Labor Cost? Did I pay too much?
31 July 2024 | 13 replies
The main house is completed and as far as labor, I spent $40,000 on just labor and that includes everything from full gut demo to finishes.We are talking about a 4BD, 3BTH two story 2400 ft.² home with a bonus room.This was a full gut job, replaced…12 Windows (new construction)2 sliding doorsTook out all carpet throughout.Took out this ugly 2” thick tile from half of the downstairs portion.Removed popcorn throughout the entire houseTook one wall downA little framing workReplaced entry door 80” x 92”Drywall patchingSmooth drywall work50 recessed lightingAll electrical neededAll plumbing neededNew cement walkway instead of one walk to the front door I created two steps with two lights in each step.Install kitchen cabinets, excluding countertopInstall all three vanities3 bathtubs with one being a modern standalone tub in the masterAll tile work (bathroom wall & floor, kitchen backsplash)Installing of all hardware, faucets, showerheads, etcInstalled 8 single panel doors with hardwareAdding self-leveler after tearing out that thick tileNew LVP flooring throughout the entire house except bathrooms,all baseboards, trimsPainting the entire house, painting all the doors, painting the outside trim.Reframing the outside balconyReframing the fireplace to install new linear modern electrical fireplaceand they took care of the two trash bins.I mean, completely redone.The only thing that was not included in the $40,000 is landscaping, counter top cut and install and of course the ADU which I’m currently working on now.So my question for my fellow investors and contractors did I pay too much?
Jack Lindstrom As a Co-Host, how do I receive my payout for multi-channel listings?
31 July 2024 | 9 replies
Cleaning fees are a pass through from the guest, so you would be receiving the payment from the guest within a short time after check-in and then you can directly pay the cleaner with the cleaning fee you received.
Sara Acord House Hack or Leave It Be
1 August 2024 | 10 replies
Main floor has 3 bedrooms and a full bath.
Agustin Peirano What type of insurance I need to rent my Townhouse/Condo?
1 August 2024 | 1 reply
Construction materials: Frame, no basement, roof: asphalt shingles, Floor: Carpet on stairs and bedrooms, LVP: Kitchen and living room.
Brian M. 30-day rentals viability?
1 August 2024 | 13 replies
And it's not rocket science to sheetrock, floor and then re-trim. 
Kelsey VanSleen Flipping with Seller Financing?
31 July 2024 | 5 replies
Like anything is sales (and you are in sales even when you are trying to buy a property), the less clean cut the deal, the more likely it is to get rejected.