24 March 2024 | 8 replies
I suppose even a 1/4” layer of sound dampening membrane is better than nothing, but why on earth would replacement of the entire subfloor be required?

7 April 2024 | 5 replies
***NOT taking off the old shingles, is only saving you around $1K (give or take)... if you're already going through all the hassle of new system, bite the bullet and do it correctly.When you remove the old layers, you can then: do any necessary repairs; possibly install ISO boards (insulation boards) smoothly; install the good membrane (not simple felt!)

6 April 2024 | 2 replies
Everything passed except for the "secondary roof" which consists of a membrane roof over an unheated, patio "room" separated from the man house by glass sliders.

27 January 2023 | 4 replies
Even in low end rentals, we only recommend 100% complete ceramic tile walk-in showers or cast iron/porcelain tubs with ceramic tile surrounds, and, depending on the property and the Owner preference, either a copper or membrane actual shower pan.
17 December 2014 | 22 replies
You will also want to use a decoupling membrane between the subfloor and the tile.

12 January 2015 | 20 replies
Before tiling he would then roll-on a waterproofing membrane on the concrete board.

2 November 2016 | 14 replies
If you tile, you can put down a crack isolation membrane down under the thin set.

31 January 2021 | 28 replies
The peel and stick membranes are rated for 30+ days of exposure and they have two layers.5) I have had roofing contractor quote me for GAF Timberline, Owens Corning Duration, and Atlas....

15 September 2019 | 20 replies
It's going to cost 1.5x or 2x what you projected.You will need waterproofing and basically build a "tub" of waterproofing membrane.
1 March 2020 | 37 replies
Roof replacement shall include the removal of all existing layers of roof coverings down to the roof deck.Exception: Where the existing roof assembly includes an ice barrier membrane that is adhered to the roof deck, the existing ice barrier membrane shall be permitted to remain in place and covered with an additional layer of ice barrier membrane in accordance with Section 1507.1511.3.1 Roof recover.