![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/595796/small_1621493411-avatar-mariof2.jpg?twic=v1/output=image&v=2)
25 January 2018 | 17 replies
In this case the CA Residential Code says (R703.1.1) "The exterior wall envelope shall be designed and constructed in a manner that prevents the accumulation of water within the wall assembly by providing a water-resistant barrier behind the exterior veneer" (https://codes.iccsafe.org/public/document/details/toc/1005)This section means that as a designer (and contractor) we must ensure that the building envelope can resist water if the exterior cladding (rain-screen) is damaged.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/632502/small_1621494249-avatar-kevinb167.jpg?twic=v1/output=image&v=2)
4 February 2018 | 16 replies
If the tub is installed you will have to disconnect the tub shoe assembly and plug there.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/960445/small_1621506325-avatar-vante1503.jpg?twic=v1/output=image&v=2)
23 January 2018 | 3 replies
Assemble your team of professionals (Realtors, lenders, renovation guys) and trust their numbers.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/152323/small_1621419732-avatar-tomtully.jpg?twic=v1/output=image&v=2)
27 January 2018 | 21 replies
In this scenario, investors could also look to assemble adjacent properties during the hold period to further maximize the upside exit.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/935906/small_1621505833-avatar-hunnaharms.jpg?twic=v1/output=image&v=2)
1 February 2018 | 11 replies
Will they have contractors they prefer to work with or will I have to assemble everyone and get the entire team on the same page?
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/691046/small_1621495536-avatar-gilbertl1.jpg?twic=v1/output=image&v=2)
28 January 2018 | 2 replies
Interest rates have been so low for so long, I don't even know if mortgages still assembled.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/253471/small_1621436444-avatar-joeg1.jpg?twic=v1/output=image&v=2)
30 January 2018 | 19 replies
BGE has a "Legislative Liaison" who elevate complaints/concerns from members of the General Assembly - you probably won't be surprised at how much quickly your issue gets addressed when it comes from a politician whose job it is to regulate BGE.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/137320/small_1621418797-avatar-paradiddle57.jpg?twic=v1/output=image&v=2)
20 October 2017 | 4 replies
Do I approach turnkey providers or is there a way to learn about markets and assemble a team from a distance in these markets on my own?
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/653341/small_1621494752-avatar-travishewlett.jpg?twic=v1/output=image&v=2)
24 February 2020 | 10 replies
@Travis HewlettIf you have a full apartment in the basement (with kitchen) then the basement ceiling / main floor assembly would/should be fire rated (1-2 layers of 5/8" Fire-X sheetrock).
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/676220/small_1621495244-avatar-adriana17.jpg?twic=v1/output=image&v=2)
13 December 2017 | 6 replies
If your walls can be assemble by a machine offsite, it is going to require less work on-site.