
7 November 2024 | 0 replies
Additionally, ensuring the renovations met both current rental standards and future plans required careful planning and oversight.

6 November 2024 | 5 replies
Or does this happen so often and they really dont care?

7 November 2024 | 0 replies
The lengthy process required careful planning.

7 November 2024 | 0 replies
The lengthy process required careful planning.

6 November 2024 | 12 replies
A reliable tenant is someone who stays many years, always pays the rent on schedule, and takes good care of the property.

6 November 2024 | 6 replies
A paying bird in hand so to speak... as long as they're taking care of the unit and paying.

9 November 2024 | 21 replies
Current building code requirements and local amendments should be considered forrebuilding the fire-damaged portion of the residence.The Engineer shall have no liability to the Owners, or to others for the acts or omissions of theContractor or any other Persons performing work on the project, or failure of the Contractor tocarry out the work in accordance with this letter, except where specifically inspected andapproved by the engineer and discovery of defect is possible within the normal ability or standardof care for the industry.This report is based on a diligent visual inspection of the referenced areas.