
9 June 2015 | 3 replies
My problem is they want sell to me because I only have 15 square feet of countertop and they want cut granite unless you buy 25ft.

11 January 2017 | 8 replies
Basically, everything is done except for refinishing the hardwood floors, installing light fixtures, bathroom accessories (mirrors, towel bars, etc) and we are still waiting on the quartz counter tops for the kitchens and bathrooms to be delivered.

3 August 2015 | 14 replies
Now that the cabinets and counter tops are ripped out, he tells me that his solid surface guy can't get him the countertops for the price he wanted, so we will have to go with laminate (that's what I planned anyway, so I let it go).

19 October 2015 | 3 replies
I still have to run all new trim and trim everywhere.Everything you see in these two rooms is new drywall that I did myself, which is mostly what took so long.This is what the cased openings look like from the other side.I still have to get a plumber in to prep for the sink, dishwasher, disposal and run a new water line to the new fridge location.I also have to get the electricians back in the finish up the Leds under the uppers and trim out the can lights and put in outlets, etc.Then comes the stone countertops.

29 July 2015 | 26 replies
I also have Magic Chef micro/convection counter top ovens that I got at Costco for about $150 in most of my places.

29 August 2016 | 29 replies
Sorry, been a little busy so did not post pics.Here is what we did with the fireplace and structure over the back porch.Also updated the kitchen with new granite counter tops and backsplash, fixed cabinet, new SS sink, faucet and opened up the wall adjoining the dining room to add a breakfast bar.
25 February 2016 | 33 replies
With that being said, it looks as though we will get nicer countertops and our linoleum floor may be upgraded to tile.

8 December 2017 | 40 replies
I have them hold countertops and the like in "will call" so stuff isnt on the job in the way till Im ready for it.

14 September 2013 | 53 replies
Wes,I was talking about cabinets counter tops is what I am talking about.