
1 October 2024 | 24 replies
It may sound nice to pay a 5% management fee but the extra fees can add up to be more than the other company that charges 10% with no add-on fees.

30 September 2024 | 10 replies
I want to get into the commercial side but i understand I have to start with residential to work my way upGoing bigger with a 4-plex could be a smart move if you have the financial stability and confidence to handle the extra management responsibilities.

30 September 2024 | 4 replies
It's easy to obtain, costs very little, and doesn't require extra, on-going effort to maintain.

30 September 2024 | 46 replies
Could the rental places through in some small extra by doing the same?

30 September 2024 | 16 replies
The highest performing short-term rentals have a design eye, their photographs weren't shot by an amateur's iPhone, and they offer more than one extra that others aren't (hot tub, sauna, views...).Create a differntiated Airbnb, and you'll outperform others ... be that first page or second or third.

1 October 2024 | 29 replies
For example, I’m doing three side by side duplexes and it’s costing me $135 psf, but I had to spend an extra $10k per foundation because of bad soil, and the smaller the property the higher the cost psfI’m working on a 28 unit with elevator, demo required, green roof, and it’ll cost me around the same psf as the duplexes.I’m doing three side by side triplexes which are full renovations, basement digout, all new facades, and that’s costing me about $106 psf for construction Non of these numbers include architecture, geotech, MEPS, environmental, utility plan, or finance costs

30 September 2024 | 8 replies
I will just be adding an extra loan which is what worries me a bit.I’m looking for away we can start small and grow as we continue.

23 September 2024 | 5 replies
Obviously this depends on the amount of your loan, when you start to pay the extra amount, etc.

24 September 2024 | 4 replies
. $1,520.00•Demo about 12” of walls and rip out entire shower pan and step •Install cement board on exposed wall •Apply RedGuard and Waterproof membrane to shower pan and up the exposed walls •Install new drain adapter in shower floor •Install new tiles provided by client Optional (just in case fixing shower pan does not fix the water leak) rebuild shower. costs extra $5100•Demo shower • New plumbing for a new fixture •Install cement board on exposed wall •Apply RedGuard and Waterproof membrane to shower pan and up the exposed walls •Install new drain adapter in shower floor •Install new tiles provided by client •Client provides plumbing fixture

25 September 2024 | 2 replies
Here are a few suggestions on how you can maximize the wealth of information available: Check out the blogs and podcasts, or take advantage of the search feature (magnifying glass).