
19 April 2015 | 23 replies
Hey @Sean Troy Good question in terms on how I filtered/cleansed the data and with this data set it was small enough that I could basically do a manual check to ensure nothing stood out.

6 February 2023 | 11 replies
The main drawbacks to this are that it is very much not passive as this would likely be a full-time job for 3-5+ years to get it stood up, your new entity would be responsible for upkeep and repairs for the next 20+ years, and once the Power Purchase Agreement (PPA) is up you'd be responsible for disposing of the aging equipment if they don't want to re-up.

15 September 2022 | 14 replies
They both stood to financially benefit from higher commission, because a "den" vs a "bedroom" would change the value significantly.

5 January 2023 | 44 replies
Just make sure that whoever is doing it, if it’s on a subfloor that the trusses are strong enough to support the weight.

7 April 2021 | 10 replies
Hope to hear from you.Reggie Truss

14 June 2023 | 0 replies
As I stood on the front porch, I could already envision my dream home.

14 June 2023 | 0 replies
As I stood on the front porch, I could already envision my dream home.
2 January 2023 | 8 replies
Then she stood at the fence expecting me to come out and have a confrontation with her, which I won't do.

22 June 2022 | 9 replies
Phase 1:· contract signed· deposit sent in (no work begins until a deposit is received)· survey ordered· power location orderedPhase 2 (once survey completed and power location determined):· Plans and Site Plan ordered· Truss Layout OrderedPhase 3 (once plans completed):· order septic design· order energy calcsPhase 4 (after septic design completed)· septic and drainage sent to update plans set· septic sent to DOH for review· septic design approved by DOH· approved septic design transposed into plan setPhase 5 (after updates completed to plan set):· Completed updated plan set sent back to DOH for final permit approval and permit issue· Completed updated plans set sent to engineer for final sign and stampPhase 6· Plan set signed and stamped submitted to City of Cape Coral Permitting along with permit application· Septic Permit IssuedPhase 7:· Initiate loan closing process· review in City of Cape Coral· Permit Approved/Fees paid· Permit Issued/Picked up· Loan closed (either just before or after permit pick up)· Site Prep beginsConstruction Begins!