Yi C.
Let's talk about buying land and lease for solar development
15 September 2024 | 19 replies
Common expenses would be utility mandated SCADA upgrades for system isolation, metering packages, engineering & testing, etc.
Matt Le
Looking for anyone who has used water submetering companies
5 September 2024 | 5 replies
I guarantee the month after the meters come on, the person responsible will fix their leaky toilet or cut back on consumption.
David P.
Buying a property with 2 unpermitted units
10 September 2024 | 19 replies
Everything is all private with seperate entrances but the meters are split (70/20/10%) between the 3 units.
David De La Torre
Cleveland, OH Utilities
31 August 2024 | 9 replies
I have a triplex in Shaker Heights that has two units sharing the electric meter - i want to split it and am being told it is not possible in CLeveland.
Helene Goodworth
Triplex in NY with section 8 tenants already in situ
2 September 2024 | 13 replies
They all have their own separate oil tanks/electric meters etc. and there is well water.
Hunter Beckstrom
Single-family Homes vs. Small Multi-family Investing
2 September 2024 | 8 replies
If the Multi-Fam does not have individual utility-meters for all units, then you have to figure out what to do or it can potentially eat away at your cash flow. 99% of Single Family homes do not have this problem.These are just a few pros and cons.
Irene Uribe
FOUR UNITS BRAND NEW FOR SALE UNDER 540k Making 63k a year.
29 August 2024 | 0 replies
The price for these 4200 SF buildings are very low about $135,000 per unit leased at $1350 a month and they have high end custom finishes and private patios, covered parking for 2 vehicles and usually all individual meters.
Irene Uribe
FOUR UNITS BRAND NEW FOR SALE UNDER 540k Making 63k a year.
29 August 2024 | 0 replies
The price for these 4200 SF buildings are very low about $135,000 per unit leased at $1350 a month and they have high end custom finishes and private patios, covered parking for 2 vehicles and usually all individual meters.
Greg Lovern
Turning basement into ADU, best practices for breaker box, furnace, water heater
28 August 2024 | 1 reply
Make sure your site meets the 'above grade' numbers, and 2nd means of egress requirements.So long as you can do the project as per local codes, you must allow each unit to access their own meters/breaker boxes.Hope this helps.
Ani Chat
PGE requiring separate metering but CA ADU requirements says otherwise
23 August 2024 | 10 replies
In addition when it is time to sell, buyers like units to have separate meters.