
14 July 2024 | 26 replies
Thus, the sixth obligation was met under the Agreement.

13 July 2024 | 5 replies
Debris from second floor piled up on the first floor, almost all exterior was melted away and would definitely call for a feasibility study.

14 July 2024 | 11 replies
@Benjamin SulkaThis one was mostly cosmetic: paint, carpet/floors, light fixtures, trim, landscape clean up, rodent remediation, bathroom vanities in the 1/2 baths, and some of the windows.Rehabbed one unit at the time aside from the windows.

14 July 2024 | 7 replies
The latest finishes, floor plans, and overall feel in theory should be the latest and greatest, which looks great in a tenant's eye.

14 July 2024 | 56 replies
If a fan is needed the tenant would buy a floor fan.

14 July 2024 | 21 replies
Run a Clorox wipe over the windowsills and mop the floor.

13 July 2024 | 1 reply
Complete remodel, redid or replaced all flooring, plumbing, electrical, new roof on the garage and retied all the windows.

13 July 2024 | 3 replies
The property has an apartment on the top floor, a beauty salon on the main level, and an unfinished basement.

17 July 2024 | 37 replies
My wife has a formal degree in design where whe loves creating floor plans and building/renovating homes.

14 July 2024 | 27 replies
The first floor is a 2/1 which is rented and the second and third floor is one unit with 4 beds 2 bath.