1 August 2024 | 3 replies
(on things like flooring, cabinets, remodels, siding etc) I want to hear thoughts on going as cheap as possible, making the house look "high end" (possibly attracting higher end renters and charging more) or somewhere in the middle?

1 August 2024 | 4 replies
As for the permanent upgrades, can the LLC cover and write off items that are considered a repair or upgrade, like painting and flooring, or new AC or hot tub?

1 August 2024 | 9 replies
I also plan on moving the master bedroom (currently upstairs) to the other ground floor bedroom, and making the upstairs bedroom a "guest room."

1 August 2024 | 2 replies
New windows, doors, Lp siding, fixtures, flooring, Sheetrock, kitchen, bathroom, trim and stairs.

31 July 2024 | 13 replies
The main house is completed and as far as labor, I spent $40,000 on just labor and that includes everything from full gut demo to finishes.We are talking about a 4BD, 3BTH two story 2400 ft.² home with a bonus room.This was a full gut job, replaced…12 Windows (new construction)2 sliding doorsTook out all carpet throughout.Took out this ugly 2” thick tile from half of the downstairs portion.Removed popcorn throughout the entire houseTook one wall downA little framing workReplaced entry door 80” x 92”Drywall patchingSmooth drywall work50 recessed lightingAll electrical neededAll plumbing neededNew cement walkway instead of one walk to the front door I created two steps with two lights in each step.Install kitchen cabinets, excluding countertopInstall all three vanities3 bathtubs with one being a modern standalone tub in the masterAll tile work (bathroom wall & floor, kitchen backsplash)Installing of all hardware, faucets, showerheads, etcInstalled 8 single panel doors with hardwareAdding self-leveler after tearing out that thick tileNew LVP flooring throughout the entire house except bathrooms,all baseboards, trimsPainting the entire house, painting all the doors, painting the outside trim.Reframing the outside balconyReframing the fireplace to install new linear modern electrical fireplaceand they took care of the two trash bins.I mean, completely redone.The only thing that was not included in the $40,000 is landscaping, counter top cut and install and of course the ADU which I’m currently working on now.So my question for my fellow investors and contractors did I pay too much?

1 August 2024 | 10 replies
Main floor has 3 bedrooms and a full bath.

1 August 2024 | 1 reply
Construction materials: Frame, no basement, roof: asphalt shingles, Floor: Carpet on stairs and bedrooms, LVP: Kitchen and living room.

1 August 2024 | 12 replies
A typical turnover can be a month or 2 of vacancy and $2-10k in make-ready costs (cleaning, paint, flooring, appliances, towel racks, vanities, etc. that gets beat up and broken norma wear and tear).

29 July 2024 | 7 replies
Are you going true hardwood vs carpet vs LVP?

28 July 2024 | 1 reply
Hard wood floor replaced all carpet in the house.