
24 January 2025 | 3 replies
We've sold 65+ homes and the biggest request we get from our Buyers is help with closing costs.Most of our deals we're providing anywhere between $5K-$10K to help Buyers offset the cash requirement to purchase a home.Even in today’s "high" interest rate environment, many Buyers prioritize closing cost assistance over an interest rate buydown.

15 January 2025 | 12 replies
It’s a longer-term game, though, with higher upfront costs.I’d say spend some time researching your target area and connecting with local investors or meetups—they’re goldmines for market insights and networking.

18 January 2025 | 16 replies
However, we have a higher end market so it always struck me as strange that we'd only provide such a small amount since it doesn't cost that much more to provide more.

28 January 2025 | 3 replies
The right agent will provide a pro forma breakdown on every property they look at, have repair costs estimated, CapEx, etc...

31 January 2025 | 21 replies
Hello Satish- the greater Banner Elk area does have a lot going for it and the right property should provide you excellent income and a potential nice getaway spot.

28 January 2025 | 6 replies
Unless you have a way to source off market deals or have a crew to provide labor for below market value, you're kind of relying on hope and luck to find a deal that works.

26 January 2025 | 13 replies
After several calls with some of the larger PMS providers, where I really took the time to dive into their products and compare features, pricing, and more, we've decided to go with Hostfully.

17 January 2025 | 8 replies
It's a long game, not a sprint.

22 January 2025 | 0 replies
Having the contractor relationship in place to move quickly and provide a high quality renovation at a reasonable price.

25 February 2025 | 23 replies
. Haul away any demo/trash – Owner pays for cost of trash – contractor to provide all the receipts Pick up any/all materials for project and deliver to jobsiteKitchen Install new cabinets. Remove soffit and half wall, reposition outlets and switches. Extend half wall to match hall. Install bar island (12 inches) on half wall. Install two pendant lights above the half wall. Install new tile on kitchen floor, including floor cement board and tile. Install new appliances (refrigerator, range, microwave, dishwasher, and garbagedisposal). Run dedicated electrical lines to the refrigerator, range, microwave, dishwasher, and garbage disposal. Install faucet and cabinet hardware. Install all necessary plumbing Install backsplash. Move outlet from behind range to more optimal location Install GFCI outlets within 4 feet of each other along counter space.o At Least two dedicated lines – all on GFCI breakers and at least one GFCI outletper circuit Install dedicated electrical circuits as follows:o Microwave: Dedicated 20-amp circuit (12/2 NM wire with a ground).o Garbage disposal: Dedicated 15-amp circuit (14/2 NM cable with a ground).o Refrigerator: Dedicated 20-amp circuit (12/2 NM wire).o Gas range: Dedicated 120-volt, 20-amp circuit (12/2 NM cable).o Dishwasher: Dedicated 15-amp circuit (14/2 NM cable with a ground).Bathroom Demolish existing bathroom elements. Install new cement board on floor and tub surround.o Seal with cement tape and red guard Install new fan, light, mirror, vanity, and replace toilet lid. Remove old tile and install new tile. Install new hardware and replace any old drain and supply lines. Install niche and tile from bathtub to ceiling. Install new bathtub and GFCI outlet. Light and fan on same switch Install all necessary plumbingLiving Room Install sliding door board trim. Install spot lights. Install 3-way switches in the hallway, living area and staircase (where marked). Install new air vent covers.Hallway/Staircase Install 10-inch LED light. 3-way switch (one near kitchen other near bedroom) Place laminate with Metal bullnose Install spotlights over staircase and one at landing at the bottomo lights on 3 way switchesBalcony Paint railing. Replace lightBedrooms Install spotlights in bedroom (up to four per bedroom). Install new fan. Spackle, sand, and paint. Paint closets and shelving, ensuring proper installation of shelves. Install spotlight in walk-in closet.Outside Paint stair railing. Install or repair 2 doorbells. Install or repair 2 exterior lights.Materials Included Cement/hardy board, drywall material. Granite slab for countertop and bar. Kitchen sink (D shape). Setting materials (thinset, grout, drywall tape, red guard, etc.). Baseboards, door, and balcony trim. Plumbing materials (excluding fixtures). Fastener screws.Total labor cost: $13,000