
5 October 2011 | 11 replies
Custom designer kitchen w/espresso cabinets & upgraded countertops, NEW stainless steel appliances including fridge & built-in microwave.

6 October 2011 | 8 replies
This can be done with drywall, paint, flooring, tile, stone, roofing, cabinets, etc.

11 October 2011 | 7 replies
For a rental, the property would need some updates, I figured no more than 5k (clean the carpet if doesn't need replacing, paint throughout the house, paint the kitchen cabinets (hideous diarrhea-green color).

22 March 2012 | 22 replies
The cabinets are jacked, but it still has a giant, commercial hood vent, powered louvers, fire suppression system, commercial 3-bay sink, regular sink and a "handwashing" station.

13 January 2012 | 11 replies
Is there no room for one or do you prefer a large hole in the cabinets where it should go?

14 October 2011 | 1 reply
Just the kitchen cabinets and countertops could easily take half of that.

1 November 2011 | 12 replies
.- New sub floors in Kitchens where needed , and then Linoleum floors in kitchen- Total Cleanout 3-4 Roll Off Dumpsters for left behind junk- Linoleum in pantry 4x8- 2 Bathrooms - Needs new linoleum and 1 needs Sub floor- Bathroom walls - rip off old plastic tile in one and make drywall and paint - Ba 2 Needs Rip off wall paper and skim and paint2 - Living room Kitchen & (2) Dining Room and 3 (6)Bed rooms Refinish Hardwood floors on ea floor so x22- Living rooms, kitchen and dining rooms, remove wall paper and skim coat, and paint all walls and ceilings2 - Living Rooms and windows remove all trim and replace with new and paint ( lead Paint )2 - Repair Bathroom Ceilings and Pantry Ceilings and then paint6 Bedrooms Fix Drywall, paint walls and ceilings2 Bathrooms install bathtub wall panels2 - Install Kitchen Cabinets , and countertops, and Sink in both pantrys2- Install Dishwashers including pipe, drains and elec in two pantries2 - Over stove - More cabinets in Kitchen @ 6 ft top and bottom with countertops2 Install washer and dryer hookups after bringing power to locationApprox 150-200 ft of Asbestos removal in basementalso what is the lead time to do all this..?

25 March 2012 | 10 replies
I thought we could liven it up by telling on our selves.I was drilling the last cabinet door for pulls this weekend when my drill stuck.

8 November 2011 | 4 replies
I think I will go this route as the PMI will not add a significant % to the interest when compared with interest I would pay to get that 20k by other means (student loans not paid off).I have found a house listed at 125k that is a 3/2 1000 sq. ft. ranch with nice updates (granite countertops, hardwood refinish, cherry wood cabinets, finished basement, modern bathrooms, etc.), garage, deck, and an 800 sq. ft., finished, basement.

14 November 2011 | 4 replies
She wants to get that "10% off on cabinets this week" deal when we are still in the demo process.