
25 December 2024 | 3 replies
I called the current landlord and he was completely surprised by the reference check.

31 December 2024 | 3 replies
Each property is different, however an engineered cost segregation study typically takes about 4-6 weeks to complete in order to ensure a quality cost segregation study.HOW MUCH MONEY CAN A COST SEGREGATION STUDY SAVE ME?

26 December 2024 | 21 replies
Eventually, after finally admitting he could not obtain a loan, he failed to return my capital, and completely stopped responding just long enough until the banks were unable to reverse any payments.

29 December 2024 | 15 replies
Feeling anxious is completely normal, but from what you’ve shared, this opportunity seems like a great fit for your goals.Your numbers look solid.

25 December 2024 | 4 replies
Under contract to buy a home that needs to be completely torn down.

31 December 2024 | 18 replies
I was fortunate to pick up a great property in Leucadia, California in 2001 which will be worth about 5M after I complete ADU's on property.

3 January 2025 | 8 replies
Existing deals will instead be saved by NOI growth driven by rent growth--if you have the staying power to hold on long enough.Supply: High deliveries remain today mostly because of "hang over" from projects that are taking longer to complete than developers (and industry analysts) expected.

26 December 2024 | 1 reply
Whether it's completing paperwork or obtaining third-party accredited verifications, attention to detail is paramount.Never assume that raising equity will be easy.

4 January 2025 | 23 replies
So thankfully with the help of my mentor and his crew of Six, we were able to complete all prep and are amidst our final pass for sanding floors before our water-based polyurethane.

26 December 2024 | 10 replies
MartinThe situation in Switzerland is particular and completely different than in the rest of Europe.