Ryan Kane
Need Advice on Next Steps for my Real Estate Portfolio
26 January 2025 | 5 replies
Then it's simple, build the home, find crews to do the work (you should already have them basically from the prior step), excavation, concrete, sealing, framing, roof/gutters/siding, windows, insulation drywall, plumbing, HVAC, electrical, finishes, etc. basically in that order.
Buddy Herbruck
Wholesaling Land DD Period
30 December 2024 | 1 reply
Start with a standard offer, and write a contingency into it for electricity, all the below ground utilities, and then work your way to zoning, permitting etc.
Ricardo Polanco
Scranton Multifamily deal - Possibility of changing 2 units to 4 units.
1 January 2025 | 4 replies
The property has 2 electric meters and one water meter.
Sino U.
Inspection: What to check for duplex
21 January 2025 | 5 replies
-Structural (foundation, wall, ceiling and floor)-Roof and Exterior(Roof Condition,Gutters and Downspouts, Siding, Windows and Doors)-Plumbing (Water Pressure,Leaks, Drainage, Pipes)-Electrical (Wiring,Outlets and Switches,Breaker Panel, Lighting Fixtures)-HVAC(Air Ducts, heating and cooling)-Water and Moisture Issues(Attic, Mold and Mildew)-Kitchen and Appliances-Bathrooms-Pest and Insect Problems-Safety Features
Ilir Livadhi
New to the U.S., Experienced Renovator Looking to Start House Flipping
15 January 2025 | 10 replies
The only thing I don’t do is electrical work.Now that I’m in the U.S., I want to focus on house flipping as a way to break into real estate investing.
Jason Dubon
Small Multifamily - Maintenance/Expense Project
5 January 2025 | 7 replies
I underestimated utilities in my early years, so I ensure those are properly captured (electricity, gas, water and trash).
Jason Bales
Understanding Housing Vouchers
2 January 2025 | 2 replies
So, if your property has all bills paid by the tenant, you will deduct from the voucher amount the set amount by bedroom count for items like water, electric, gas, etc.
Marc Robinson
Community input on a small mobile home park, distressed with high vacancy
13 January 2025 | 10 replies
Electric is metered separately from the utility.
Elizabeth Orth-He
How do you handle STR laundry for larger properties?
26 December 2024 | 9 replies
They’re built for heavy use and have faster drying times—usually 30–45 minutes—without needing major electrical changes.If you’re up for a bigger investment, adding extra stackable units in the garage could be a great long-term fix, though it’ll mean some electrical work and setting up proper ventilation.I’d probably go for the commercial upgrade in your current space first—it’s quicker and might solve the bottleneck right away.
Jarret Jarvis
10 Smart Tips for House Hacking in Chicago: Find Your Perfect Investment Property
4 January 2025 | 0 replies
Look for properties with updated roofs, electrical, and plumbing.