Christopher Blanco
Handyman/Contractor Needed for Rent Ready Work
13 December 2019 | 7 replies
The handyman did a full renovation on a unit for me.
Drew Y.
Flipping to support my buy and holds habit
26 September 2018 | 26 replies
While in 5 years I have built up a passive income stream from over 30 doors now while maintaining the W2 income as "reserves" and allowing me to take bets that I won't feel comfortable with if I were doing this full time.
Kelly Chisholm
New Member Working on First Deal
8 September 2018 | 10 replies
I am a full time pharmacist and my husband entered back in to the work force about 2 years ago after staying home with our two sons for 6 years.
Jacob Kasperski
best way to get into rentals and flips?
6 September 2018 | 3 replies
@Lee Bell yes i think a hard working job will push me to want to start real estate investing. i would only do hvac until i can quit my job and go real estate full time.
Aaron Proctor
Don’t know what to do next
18 September 2018 | 9 replies
Some did good but few had bad luck with tenants/vacancy/ or other emergency that hindered with mortgage payments and had their properties go into short sale or foreclosure even with a decent paying full time job.
Justin Pencook
Online Pre-Licensing Courses In New Jersey
26 September 2018 | 6 replies
I would like to study on my own schedule, considering I work a full time job at the moment.
Tom Mattinson
Year 1(almost) in the lift of a Canadian Investor
11 September 2018 | 6 replies
I am a fairly well trained salesman that does not want to make that a full time job.
Adam Anderson
Buying first property, is 2%, 50% rule applicable in Boston?
2 October 2018 | 11 replies
What is the effective age of the building you are buying IE. when was the last full renovation?
Lindsey Matejak
Legal Rights Against GC
7 September 2018 | 2 replies
No need to highlight that I never should have signed--I am aware and there is a HUGE back story as to why I did that is not significant to the question at hand.Due to frequent flooding, we were planning to have an overhead sewer line installed, as well as a sump pit for the basement plumbing, an ejector pit for the upstairs/exterior water that was leading to the flooding, and tying in the downspouts to the mainline at the front exterior of the house underground.The project, which was estimated to last about 15-20 days, took more like 10-11 full days.
Allison Panila
Landlord changed the contract after signed
7 January 2022 | 47 replies
Twice as much body dander is being produced and going through the furnace filter.