Skip to content
×
Try PRO Free Today!
BiggerPockets Pro offers you a comprehensive suite of tools and resources
Market and Deal Finder Tools
Deal Analysis Calculators
Property Management Software
Exclusive discounts to Home Depot, RentRedi, and more
$0
7 days free
$828/yr or $69/mo when billed monthly.
$390/yr or $32.5/mo when billed annually.
7 days free. Cancel anytime.
Already a Pro Member? Sign in here
Pick markets, find deals, analyze and manage properties. Try BiggerPockets PRO.
x
All Forum Categories
All Forum Categories
Followed Discussions
Followed Categories
Followed People
Followed Locations
Market News & Data
General Info
Real Estate Strategies
Landlording & Rental Properties
Real Estate Professionals
Financial, Tax, & Legal
Real Estate Classifieds
Reviews & Feedback

All Forum Posts by: Tony Li

Tony Li has started 2 posts and replied 7 times.

Quick update on the project 2021/06/09

Step 1 survey 

survey has started two and half weeks ago, current Toronto market has high demand on surveyors, thus all the survey companies are fully booked, three week is about the shortest time frame I can get

Step 2 engineer drawing

this step can be done parallelly with step 1. The time it cost is less then the time cost to do survey. In a perfect world, step 1 and step 2 can be done at about the same time. Timing may vary depend on the scale of the project. For example, if underpin basement is involved, it would take longer and cost more. if HVAC changes involved, you would be need to consult other experts in order to properly reflect this change on the drawing

Step 3 building permit application

The engineering/design company will take care of this after they finish the drawing and get survey from surveyor. This will be submitted to the city, currently wait time should be less than 1 month projects scale like mine. If there's any changes needed,  engineering/design company would edit their drawing and resubmit again

Step 4 hiring construction team 

This can be done parallelly with step 3, Once engineering/design company finish drawing, you can take the drawing to consult with different construction team, let them give you a quote about the cost of project, and pick the best one suits your needs

I am currently still waiting on the drawing to be done. But I have started to prepare for Step 4. From there onward, I will update when I get there.

thanks for all your support of this post, and really appreciate anyone who offered me help on this project. Please don't hesitate to advise me if you have goods ideas or point out the things I did wrong 

Thanks everyone

 





@Huong Luu message sent :)

@Marco Vigueras thank you for the reply 

the kitchen on the first floor is big enough, that I was thinking to divide it into two kitchens, one for main floor, and one for upper floor.

I live in Toronto, the garden suite is still on the table for the city to discuses, we should hopefully to see the result by Q2 this year. If that's the case in the future, I would be more than happy to take that into consideration as well :)

@Huong Luu thank you for your reply

I plan to do the conversion, refi, and rent it out for the years to come, just like a typical BRRR project.

I think the hard part is that being my first BRRR project, it's complicated to do it all by my own, and I have hard time to source a reliable contractor to monitor the whole process. Few GC I have reached out have shown me very distinctive cost for the same work, and some of them don't even want to touch any building like this old. I understand I get what I pay for, but without seeing a GC's competence first, it's hard for me to judge their price quote. For example, planner A wants $6000 for drawing and building permit application, and planner B wants only $1500, and even ask them to come on site would cost $500 each time. Any suggestion on picking a right GC?

I would love to get recommendations from you, I really appreciate your help, I will send you a message soon :)

anyone have any suggestions? thanks!

Hello everyone!

I am very happy to join the forum, I am from Toronto and looking forward to learn more about real estate investment and grow together with you guys :)

I have a property in Toronto, given its zoning already allows for duplex, I am thinking about converting the existing property to a duplex. following is some basic info:

2 story semi detach,

location: close to middle town,

purchase price: CAD 900000

lot size 21*100,

1500-2000 sqrt feet interior,

3 rooms on second floor,

6 feet high basement,

3 separate entries(front door, back door, basement),

1 detached garage in the yard but facing forward(not laneway), parking is in front of the house

already installed gas furnace,

property was built in 1910s

ARV based on nearby duplex: 1.2m+

there are several work involved in this project, including change service power to 200A, egress window for basement, open one window for main floor, separation wall to form two units, and create bathroom for main floor, separate meter if basement size is allowed.

another thing I am undecided is whether it is worth to underpin the basement to at least 8.5 inch or not, giving the basement is very small (about 400 sqrt feet)

I am only on the first stage of the project, where I just started to gather information and source for an architect and project construction team. Someone told me the building at this age can be very different internally and hard to deal with, thus I feel like there is something about this project requires way more than what I know

I love to hear your opinion about this project, is there anything I need to pay extra attention to or any pitfall should I avoid. I am still looking for an architect and project construction team, anyone has any recommendations about this type of project please ?

Thanks everyone !

Hello everyone! 

I am very happy to join the forum, I am from Toronto and looking forward to learn more about real estate investment and grow together with you guys :)

I have a property in Toronto, given its zoning already allows for duplex, I am thinking about converting the existing property to a duplex. following is some basic info:

2 story semi detach, 

location: close to middle town,

purchase price: CAD 900000

 lot size 21*100, 

1500-2000 sqrt feet interior, 

3 rooms on second floor, 

6 feet high basement, 

3 separate entries(front door, back door, basement), 

1 detached garage in the yard but facing forward(not laneway), parking is in front of the house

already installed gas furnace,

property was built in 1910s

ARV based on nearby duplex: 1.2m+

there are several work involved in this project, including change service power to 200A, egress window for basement, open one window for main floor, separation wall to form two units, and create bathroom for main floor, separate meter if basement size is allowed.

another thing I am undecided is whether it is worth to underpin the basement to at least 8.5 inch or not, giving the basement is very small (about 400 sqrt feet)

I am only on the first stage of the project, where I just started to gather information and source for an architect and project construction team. Someone told me the building at this age can be very different internally and hard to deal with, thus I feel like there is something about this project requires way more than what I know 

I love to hear your opinion about this project, is there anything I need to pay extra attention to or any pitfall should I avoid. I am still looking for an architect and project construction team, anyone has any recommendations about this type of project please ?

Thanks everyone !