The pictures are the final plumbing and we're going to shoot the top of the forms once set to be sure we're high enough. The plumbing was done, tested and passed by the city inspector, but the trackhoe contractor, who the plumber hired, was covering the plumbing up and broke it. They had to replace/repair and have it inspected again, that caused delays. We were supposed to pour on Thursday, December 9th and that was booted till Monday the 13th, but that was delayed yet again till Tuesday the 14th. They've got some smoothing to do and rock to put down.
Our plans are to burnish the pad and seal it. That will be the flooring for the apartments. I wanted to stain the concrete, but to color the concrete would cost $3,000 for putting the color in the concrete. It costs $100 a yard to color it and we have 30 yards. To acid stain it would cost $5,000. Now if we did it before we framed it in, it would cost $3,000, but then we'd have to put down felt to avoid anything staining it. I'm waiting to see how it looks. If I go with vinyl click flooring, it would cost me ~$8,000 installed. I've been convinced that the tenants can put down area rugs if they want. We'll see.