Inquiry for Rehab Subject Matter Experts
Hey BP community,
I seek to build a repeatable rehab system to complete projects in 3–4 months and would love insight from experienced investors.
What’s your typical or ideal rehab sequence for the interior of a property? I am looking to create a solid, efficient process that balances speed, quality, and budget. Any feedback would be greatly appreciated Thank you in advance.
Most Popular Reply

Hello,
I have several listings that are fix & flip projects and have worked extensively with contractors, architects, and navigated the complexities of some of the toughest cities in the DMV. Over time, we've developed a streamlined process that balances speed, quality, and budget. Here's the sequence we typically follow:
🏗️ Interior Rehab Sequence
-
Pre-Closing Preparation
-
Scope of Work: Conduct a thorough walkthrough to identify structural issues, outdated systems, and cosmetic updates needed.
-
Budgeting: Develop a detailed budget, including a contingency for unforeseen expenses.
-
Permits: Obtain necessary permits to avoid delays.
-
-
Demolition
-
Selective Removal: Remove outdated or damaged materials while preserving elements that can be reused.
-
Site Preparation: Ensure the site is clean and safe for the upcoming work.
-
-
Structural Repairs & Framing
-
Foundation & Framing: Address any foundational issues and modify framing as needed for new layouts.
-
Inspections: Schedule inspections to ensure compliance with building codes.
-
-
Mechanical, Electrical, and Plumbing (MEP) Rough-Ins
-
Systems Installation: Install or update HVAC, electrical wiring, and plumbing systems.
-
Inspections: Conduct rough-in inspections before proceeding.
-
-
Insulation & Drywall
-
Insulation: Install insulation to meet energy codes and improve efficiency.
-
Drywall: Hang, tape, and finish drywall, preparing surfaces for painting.
-
-
Interior Finishes
-
Painting: Apply primer and paint to walls and ceilings.
-
Flooring: Install flooring materials, ensuring they are protected during subsequent work.
-
Trim & Millwork: Add baseboards, crown molding, and other decorative elements.
-
-
Cabinetry & Fixtures
-
Cabinets: Install kitchen and bathroom cabinets.
-
Fixtures: Mount sinks, faucets, lighting fixtures, and hardware.
-
-
Appliances & Final Touches
-
Appliances: Install kitchen appliances and test for proper operation.
-
Final Inspection: Conduct a thorough walkthrough to address any punch list items.
-
⏱️ Timeline & Efficiency Tips
-
Project Duration: Aim for a 3–4 month timeline, adjusting based on project scope.
-
Scheduling: Use project management tools to coordinate trades and avoid downtime.
-
Communication: Maintain clear communication with contractors and suppliers to ensure timely deliveries and work completion.
📋 Tools & Resources
-
Project Management: Utilize software like Trello or Asana to track progress and tasks.
-
Checklists: Develop standardized checklists for each phase to ensure consistency across projects.
-
Budget Tracking: Use spreadsheets or financial software to monitor expenses and stay within budget.