
29 April 2016 | 3 replies
You have to buy more water taps, you have to have the property surveyed and a soils report prepared so the structural engineer can design the foundation.

2 May 2016 | 2 replies
Most HO policies for a landlord (dwelling fire, landlord insurance) are not designed for anything other than a rent house with a tenant occupancies.

30 April 2016 | 12 replies
My father became a land lord out of necessity rather than by design.

26 May 2016 | 5 replies
In the same area, semis are going to be cheaper than detached and assuming of course lot sizes and sqaure footage are equal, I wonder if buyers of high priced, fully renoed properties prefer design over actual dirt/lot size which requires maintenance, gardening etc.

29 April 2016 | 2 replies
Designed my own professional letterhead, typed a personalized letter.

5 May 2016 | 5 replies
I would opt for the CG under your direct control, let him/her deal with the nuts, bolts and subs.I had a fire and needed to r/r the upper unit en toto and a good portion of the lower from water damages - - $95k all total.I approved design choices and the GC implemented the products and services to fulfill those choices.

2 May 2016 | 6 replies
I will also find out the initial designation of the house and factor that into my analysis.

14 May 2016 | 10 replies
I have a full time job in Santa Monica so I need to stay within a drivable distance.My full time job is online marketing and I am a graphic designer by trade.

9 May 2016 | 6 replies
I would like to develop a design I can use from project to project.

5 May 2016 | 6 replies
I am new to this site, as well.... and I must say that it is truly design for our needs .