
28 February 2020 | 112 replies
I have been investing in real estate for 25 years as a developer and design build firm.

31 December 2016 | 6 replies
The equip is expensive , a new plow is about 5 to 6 grand , a sander/salter about 4 to 5 grand , and a new truck is 35 to 70 grand .

8 November 2018 | 12 replies
But you will likely not hit a grand slam.Keep trying to add value.

24 May 2018 | 15 replies
Avoiding UDFI is nice when possible, but it really does not add up to that much in the grand scheme of things, and you still very much get the benefits of higher cash-on-cash return through leverage even under an IRA subject to UDFI.

4 November 2016 | 103 replies
The other areas that I had been interested in is Grand Rapids, MI and Milwaukee, WI.

24 October 2016 | 5 replies
I really don't know anything about them but this is the kind of situation they were designed for.

23 October 2016 | 6 replies
Casa Grande is also cheaper and the strongest in the area (Maricopa, Coolige, Eloy, Florence, etc.)

24 October 2016 | 6 replies
I don't want to upgrade breaker panels and they don't want design network infrastructure, but in Maryland, you must have a Master or Limited Electrical license to pull a permit for low voltage installations.

11 November 2016 | 20 replies
Typically after 3 to 7 days you can drive on concrete but this all depends on the concrete mix design.

8 July 2016 | 2 replies
Is anything outside of the realm of your abilities/skills (ie. structural design changes, etc)?