
17 October 2011 | 3 replies
Multifamilies have been dropping as well.

20 October 2011 | 22 replies
Wish I'd sold my condo home, down $105k and still dropping.

20 October 2011 | 13 replies
Better quality properties attract better quality tenants and your vacancy rate drops.

22 October 2011 | 8 replies
Here, two layers are legal, but I'd never do it, nowadays you want (and its code in a lot of places) to use Ice & Water shield under the shingles in some areas, and that needs bare sheathing.

25 October 2011 | 14 replies
Numbers:Beds: 3Baths: 2Sqft: 1,424 (Will be 1600+ with finished sunroom)Type: Single FamilyYear built: 1955Cathedral ceilings, big 2 car garage in great shape to the rear.Asking: 79,900 (priced dropped 10k as of 10/20)Pictures available here http://www.zillow.com/homedetails/6105-Lockamy-Ln-Norfolk-VA-23502/79225876_zpid/#{scid=hdp-site-map-bubble-address}Repairs: 50k-55kSome big ticket items: Will need 50% new sheetrock plus insulation.

21 May 2015 | 62 replies
I've been considering dropping NetFlix in favor of redbox.

21 October 2011 | 4 replies
If you trend towards the average of 50% expenses the CAP Rate drops to 7%.

21 October 2011 | 8 replies
There were three price drops on this deal within first two weeks of listing until they received an offer.

1 November 2011 | 12 replies
I am trying to figure on costs of rehab as well as what to offer on home - ( I would reside in Home there after as owner occupant ) it needs the following from what i can see.. x2 for two floors/ apts- 43 replacement windows- 43 Square of Roof- a Rather Large Tree Limbs Hanging over roof cut- 4 Exterior Doors with storm doors- 6 Exterior doors with no storm doors- Raise Porch Rails to code ( another ft or so ) Porch in front is 50 ft & rear Porches 30 ft- Fix Front wooden stairs @ 5-6 ft wide- Fix Water entering basement thru Bull Ked ( add a drain or pour concrete )- Pour Concrete in Three car garage floor ( is dirt now )- Needs Heating & Hot water, and baseboard heat up two floors ( two new furnaces and FHW baseboard brought up two stories )- Electrical service upgrade from 60 amps old knob and tub to breakers and also bring up two floors adding new elec service in whole building adding plugs in all rooms plus washer and dryer hookups - 2 Panels, and move it to outside from basement..- New sub floors in Kitchens where needed , and then Linoleum floors in kitchen- Total Cleanout 3-4 Roll Off Dumpsters for left behind junk- Linoleum in pantry 4x8- 2 Bathrooms - Needs new linoleum and 1 needs Sub floor- Bathroom walls - rip off old plastic tile in one and make drywall and paint - Ba 2 Needs Rip off wall paper and skim and paint2 - Living room Kitchen & (2) Dining Room and 3 (6)Bed rooms Refinish Hardwood floors on ea floor so x22- Living rooms, kitchen and dining rooms, remove wall paper and skim coat, and paint all walls and ceilings2 - Living Rooms and windows remove all trim and replace with new and paint ( lead Paint )2 - Repair Bathroom Ceilings and Pantry Ceilings and then paint6 Bedrooms Fix Drywall, paint walls and ceilings2 Bathrooms install bathtub wall panels2 - Install Kitchen Cabinets , and countertops, and Sink in both pantrys2- Install Dishwashers including pipe, drains and elec in two pantries2 - Over stove - More cabinets in Kitchen @ 6 ft top and bottom with countertops2 Install washer and dryer hookups after bringing power to locationApprox 150-200 ft of Asbestos removal in basementalso what is the lead time to do all this..?