
3 March 2020 | 7 replies
Every wall was a neon pink and i painted that gray color as well as removing the also bright pink carpet from every room for the laminate flooring.

5 March 2020 | 26 replies
Counter tops and flooring are easy to measure and get a per ft price.

3 March 2020 | 4 replies
If I was renting and the landlord said "The dryer repair person will be there at 1:00 to fix it" It would not be outside the realm of expectation on my part that "Cool, I'm working at that time they can do whatever they need to, I'll just make sure I clean my socks off the floor".

3 March 2020 | 0 replies
New walls and drywall and paint and floors and kitchen and bath.

3 March 2020 | 3 replies
You want about 3-4 inches of coverage up the wall, and same on the floor. 1 oz I believe makes a gallon of mixture.

3 March 2020 | 11 replies
He was suggesting just to paint, and change the flooring.

4 March 2020 | 14 replies
Bathroom can be demo’d in 2-4 hours and a toilet reset for interim use prior to flooring being installed.

7 March 2020 | 46 replies
Needless to say dumb a sellers agent went in to turn on boiler because one of the repairs were to fix all radiators to soon find out his repair men had cut an entire pipe on first floor leading to second so the entire rooM filled with steam.

3 March 2020 | 0 replies
He did flooring, countertops, paint, ripping out a weird semi-wet bar from the basement room to convert to a closet so it can operate as a functioning bedroom now.

4 March 2020 | 7 replies
New flooring, interior and exterior paint, new roof and all new water heaters.