
2 March 2020 | 4 replies
I have a client who wants a home, its been flipped, there is a 1200 SF adu, its one room, with bathroom, wants to build out walls and kitchen without permits... and then wants to BRRRR.
2 March 2020 | 7 replies
However, even with renting you are not permitted to give up control of the property to a property management company.

2 March 2020 | 2 replies
Has anyone been able to utilize the new ADU ordinance 4936 rules to successfully get a permit on an existing Ohana or add a legal Ohana to a property?

4 March 2020 | 5 replies
Not sure about local code but I would imagine they needed town and/or utility's permission to do the install and maybe validate any credits/rebates, so I missed...7) see if local utility or town have a record in their old permits, then call installer.good luck.

2 March 2020 | 4 replies
You can request help on interpreting any of the rules on BP, but for the definitive answer, email ADU@ the HCD domain (BP does not permit email addresses).

22 May 2020 | 27 replies
Prospecting leads from tax lien lists?

6 March 2020 | 3 replies
I have a prospective tenant who says they are building a home and would like to pay me 6 months rent up front.

4 March 2020 | 12 replies
You should always get permits.

3 March 2020 | 4 replies
I've hauled 2+ million lbs of rock to prevent erosion on my 3/4 mile lake shore to save the land..and have had enough stupid Govt interference and permits to last 3 lifetimes.

6 March 2020 | 5 replies
The permits and approvals cost at least $35K...Basically my idea hinges on the fact that the average house costs ~ $400 / sq foot in my area, but I could save 30% of the cost just by building a manufactured house from scratch on a lot.