
18 June 2019 | 19 replies
Replaced kitchen cabinets and appliances (Cabinets are not very current, very odd)BUTThen did not update the master bath(1995), nor the 2nd bath.?

26 January 2014 | 27 replies
Let's say you have to repaint every two years, get the carpets cleaned (and/or hardwoods refinished) every two years, replace the carpet every 5 years, fix broken cabinets/appliances/plumbing fixtures/light fixtures, etc.
2 February 2023 | 0 replies
kitchen with granite counters, stainless appliances, shaker cabinets, and stainless appliances.

2 October 2020 | 5 replies
I don't do percentage completion, but identify and attach specific tasks - carpeting, kitchen cabinets, roof, exterior paint, interior paint, etc. - to specific draws so that I can send out an independent draw inspector with the SOW and draw schedule to tell me, for example, 1) roof done?

25 December 2018 | 6 replies
Do you do the cabinets first to save on the flooring material?

23 January 2023 | 7 replies
Here is the basic timeline:- Purchased property in late 2019 for $490,000- Property was a 2 story 4 bed/2.5 bath house with a full unfinished walkout basement- Premium for the property compared to one without the walkout was somewhere around $30-40,000- Basement was around 1200sqft unfinished space and the apartment was best setup to be around 800sqft- Started initial framing in early 2020, but COVID put a stop to some plans due to cash reserves becoming more important- Project was on hold until late 2021 when framing resumed (all framing was done by me)- Jan 2022 had a tankless water heater installed (had 20 year old tank already and don't want to run out of hot water with tenants) $3500- Jan 2022 had main electrical panel upgraded to 200A setup and also had 100A sub panel installed in basement and charger for car in garage $6000- Feb 2022 finished 95% of framing and GC began plumbing work- Feb 2022 HVAC work began (We installed a fully separate Mini Split Heat Pump for the unit) $5,400 for all fans and mini split install- March 2022 Electrical Rough In was completed- March 2022 Rear Door (Entrance) was swapped from a small slider to a full 36" exterior door- March 2022 Passed rough inspections and given the go ahead for drywall- Late March 2022 Drywall install completed- Walls are standard 1/2" single sheet- Ceilings were done in the following order for sound insulation (Fiberglass batting, resilient channel, 5/8" drywall, Green Glue, 5/8" drywall) $7500- April 2022 Primed all walls and ceiling- April 2022 Carpet and Vinyl flooring installed- April 2022 Trim installed- April 2022 Kitchen cabinets installed- Mid April 2022 Interior doors arrived and were installed- Mid April 2022 Shower pan was built out- Mid April 2022 Butcherblock counters cut and fitted with sink and oiled- Mid April 2022 Puck lighting installed- Late April 2022 Appliances arrived- Late April 2022 Painting continues (biggest regret here was not hiring a painter.

25 June 2013 | 7 replies
Foreclosed for $58,000. 1700 sq ft ranch, all hardwood floors & cabinets with leaded glass....Sat empty for 5 years.
20 July 2016 | 9 replies
Their children scribbled with permanent marker/crayons/nail polish/paint on a 2 year old carpet, walls, ceilings, doors, cabinets and backyard stucco.

24 June 2015 | 6 replies
I didn't have a vacuum cleaner or broom, so when I left I packed all my things, wipe the bathroom toilet/sink, wipe kitchen cabinets and pick up any noticeable things on the bedroom floor.

29 June 2022 | 6 replies
Cabinets of solid wood so anything broken can be repaired or replaced.