
7 February 2025 | 16 replies
My first question would be is this profitable?
17 January 2025 | 5 replies
The details of the incident remain unclear, but they intentionally granted access to someone who subsequently stole major appliances.

25 February 2025 | 21 replies
That being said I do accept rent from all the major electronic services.

23 January 2025 | 5 replies
., HVAC tune-up, plumbing fixes)Deep clean entire property pre-listingEstimated Cost: $5,000Total Estimated Renovation Cost: $145,000Project TimelineWeek 1-2: Planning and DemolitionFinalize design and materialsObtain necessary permitsBegin demolition (kitchen, bathrooms, floors)Week 3-5: Structural and Major InstallationsInstall new cabinets and countertops in kitchenComplete bathroom tiling and vanity installationRefinish or replace flooringWeek 6-7: Painting and FixturesPaint interior and exteriorInstall lighting, hardware, and plumbing fixturesWeek 8: Finishing TouchesLandscaping and curb appeal updatesDeep cleaning and stagingTotal Timeline: 8 Weeks*This link comes directly from our calculators, based on information input by the member who posted.

26 January 2025 | 13 replies
We currently use Hospitable for 12 properties, and it's working fine, no major issues, and I know they've been expanding with new features.

24 February 2025 | 71 replies
If needed add a minimum of 15kModerate RehabCan save at least two of the following- Electric, Drywall, Flooring, Plumbing (likely touch ups in the other two)Redo KitchenRedo Existing BathroomsNo framing or architect plans neededPaintFinish BasementAdd a split unit to existing duct work (prevent from tearing up existing plaster/drywall)*Think of a grandma home that does not have knob and tube and has been on top of roof/windows so we aren’t as worried about mold/water damage*Light RehabComps do not need a finished basement or basement is finished to comp standardComps do not need HVAC or you can just add split unit to existing ductworkKitchenBathroomFloorsPaintNo major rehaul of mechanics needed (aka do not need to rip out walls)LipstickPaint, Floors, appliances in the most basic sense ARV Range Full Gut Moderate Light Lipstick +450 (A+) 150-300 N/A N/A N/A 380-450 (A) 90-120 70-75 N/A N/A 270-400 (B/B+) 85-100 60-70 N/A N/A 210-270 (B-) 75-80 60-65 45-55 N/A 170-210(C/C+) 65-75 50-60 40-50 15-30 140-170(C-) 60-70 50-60 35-45 10-20 120-140 (D) 55-65 40-50 25-35 5-15 Philly Neighborhoods Breakdown:A+ : Obvious Prime Real Estate.

31 January 2025 | 8 replies
As you can see we are still cleaning up a few major things, so we probably can't work on that right away.

11 February 2025 | 167 replies
My advice is to keep taking profits along the way.

26 February 2025 | 9 replies
They eat all their profits because they have to live off it.

1 February 2025 | 2 replies
We have grossed $300k in revenue over the first 12 months of operation, at a ~50% profit margin.