
16 August 2024 | 20 replies
Much cheaper to maintain and on the electric billand etc.I only build cabins in the woods though so again, the drainage would be the issue if you are more in a neighborhood or something.

14 August 2024 | 8 replies
How bad is bad when you say that the power electric company "messed" up the yard?

14 August 2024 | 1 reply
Insurers are now looking at roof conditions, over hanging trees, type of water pipes, and electrical.

14 August 2024 | 6 replies
His motel has been shut down since COVID-19 for not being up to code, now, he has renovated it and water/electricity is running.

13 August 2024 | 4 replies
Recommend you get with your engineering firm and tell them what you want.

15 August 2024 | 16 replies
Don’t forget monthly electric costs to keep the recirculating pump on, and water costs to maintain proper water level.

13 August 2024 | 0 replies
The tenants power was shut off for non-payment and I need to put the account back in my name.Recently my HOA sent me photos of my rental townhome with a gas generator running in the yard and the electric meter missing and shorted out.

14 August 2024 | 20 replies
Someone comes in and uses lead roof materials, electrical conduits, a tank lining, soft solder, orparts from China all which have lead in remodeling after the certification...I know lead is dangerous for children.

13 August 2024 | 5 replies
Long story short, they recommend a process that basically looks like...Soil scientist --> (septic engineer IF needed) --> site plan --> county approval...We've spoken to a few soil scientists and they all quote 2k-5k to analyze the property for an appropriately sized septic system.

16 August 2024 | 21 replies
I agree with the previous comments about figuring out what your goals are in the next 10 years and reverse engineer - what do you need to do to achieve this?